MD&A · 2025
In this section4 topics
Overview of Operations
Overview of Operations
Performance 2025 at 31 December 2025
Performance of Asian Marine Services Public Company Limited and Subsidiary the details are as follows:
Revenue categories | 2025 | 2024 | 2023 | |||
Amount | % | Amount | % | Amount | % | |
Ship repair | 523.80 | 55.92 | 500.40 | 47.44 | 493.71 | 86.07 |
Ship building | 325.37 | 34.74 | 503.09 | 47.70 | 20.76 | 3.62 |
Ship supply | 1.12 | 0.12 | 4.10 | 0.39 | 8.87 | 1.55 |
Subsidiary company income | 70.12 | 7.49 | 33.64 | 3.19 | 31.46 | 5.48 |
Other revenues* | 16.23 | 1.73 | 13.55 | 1.28 | 18.8 | 3.28 |
Total | 936.64 | 100.00 | 1,054.78 | 100.00 | 573.6 | 100.00 |
In 2025, the Company generated total service revenue of 936.64 million baht, representing a decrease of 120.82 million baht, or 11.60%, compared with the year 2024. The Company has the following analysis on its results of total revenue, cost and expenses.
Revenue
Ship Repairing revenue
The Company had Ship Repairing revenue was 523.80 million baht, a decrease of 23.40 million baht or 4.68% from the year 2024. The increase was driven by several key factors:
Effective management of project scheduling and shipyard capacity utilization, enabling the Company to continuously undertake high-value projects.
The award of vessel modification and conversion works to comply with classification society requirements. These projects are more complex and higher in value than routine maintenance and repair work, resulting in an increase in the average revenue per vessel.
The Company’s core customer base continued to comprise oil tankers and ferry & passenger vessels, which operate under regular maintenance cycles, supported by the recovery of waterborne transportation activities and the overall economic environment.
The Surat Thani branch in 2025, Revenue was primarily generated from passenger vessels and tourist boats, in line with the recovery of the tourism sector in southern Thailand. This led to an increase in vessel traffic and demand for repair and maintenance services. In addition, the branch generated revenue from engineering and construction works, such as pier ramp improvement projects, which helped diversify revenue sources and enhance the stability of the branch’s operating performance.
Shipbuilding revenue
Shipbuilding revenue was 325.40 million baht, which decreased 177.69 million baht or 35.32% compared with the year 2024. The decline was mainly attributable to the timing of revenue recognition for shipbuilding projects.
In 2025, The company recognized revenue of the Project Hydrographic survey & Buoy Tender from Royal Thai Navy which had accumulated revenue recognition of 95.80%. Certain aspects of the project progressed later than planned, resulting in the remaining revenue being recognized in the first quarter of 2026. The Company completed the project and delivered the vessel on 13 February 2026.
In addition, the Company began recognizing revenue from the Project Sattahip Commercial Ports tugboat from Sattahip Commercial Ports – Royal Thai Navy, which had accumulated revenue recognition of 13.30%. As a result, project-related revenue recognized during the period was lower compared with 2024, during which the Company had accumulated revenue recognition of 61.08% from the Project Hydrographic survey & Buoy Tender from Royal Thai Navy, as well as 21.15% cumulative revenue from the Project Single Conveyor Garbage Collection Boat (HDPE) from Royal Thai Navy.
Ship Supply revenue
Ship Supply revenue was 1.10 million baht, which decreased 0.40 million baht compared with the year 2024. This revenue is from the sale of polyethylene hyacinth collection boat with a mesh conveyor system project to The Siam Refractory Industry Co., Ltd amount 1 vessel, which was delivered to Tha Lan Subdistrict Municipality, Saraburi Province, on August 18, 2025. The project was undertaken through Eco Marine Co., Ltd., a subsidiary of the Company
Cost and Expenses
The cost of services
The cost of services amounted to 708.90 million baht, a decrease of 125.96 million baht or 15.08% compared to the year 2024. This decrease was consistent with the decline in shipbuilding revenue, as revenue recognition from such projects was lower than in the prior year, resulting in a proportional reduction in project costs. For ship repair services, the Company was able to efficiently manage and control costs related to materials, labor, and other associated expenses within the approved budget. As a result, costs remained in line with the plan and supported the Company’s profitability.
The distribution costs Administrative expenses and Management remuneration
The distribution costs amounted to 10.36 million baht, an increase of 0.63 million baht or 6.47%. This increase was in line with marketing activities and the expansion of the customer base.
Administrative expenses and Management remuneration amounted to 157.27 million baht, an increase of 16.06 million baht or 11.37% compared to the year 2024. The increase was partly attributable to higher personnel expenses, organizational restructuring, and operating expenses incurred to support future projects. Nevertheless, the Company continued to exercise prudent cost control to ensure alignment with the scale of its business operations.
The Finance costs
The Finance costs amounted to 4.47 million baht, a decrease of 0.61 million baht or 12.01%. The company’s bank overdrafts and short-term loans from financial institutions amounting to 90.36 million baht, as well as the Company’s early repayment of long-term loans from financial institutions As a result, the Company’s interest expense burden decreased and reflects more effective liquidity management and capital structure management
Operating Results & Financial Condition
Operating Results & Profitability
The gross profit of 211.51 million baht for the year 2025, an increase of 5.14 million baht or 2.49% compared to the year 2024. Profitability has increased, with the gross profit margin of 22.98% This improvement was attributable to (1) a reduction in shipbuilding project costs, in line with the lower level of revenue recognition from such projects, and (2) the Company’s effective cost control over ship repair operations, including materials, labor, and related expenses, in accordance with the established budget.
Liquidity & Capital Adequacy
Liquidity Analysis
The current ratio as of 31 December 2025 was 1.08 times, increasing from 1.03 times as of 31 December 2024. Current assets decreased by 78.77 million baht, mainly due to a decrease in advance payments for goods and unbilled revenue, as the company was able to issue invoices and collect payments more efficiently, resulting in lower unbilled revenue. Current liabilities decreased by 92.96 million baht, primarily due to a decrease in short-term borrowings (trust receipt payables) and long-term borrowings totaling 83.12 million baht. As a result, the company’s liquidity position improved compared to 2024.
The gross profit margin for 2025 was 22.98%, representing an increase of 3.16% compared to the previous year. Although revenue from services decreased by 11.60%, the reduction in the cost of shipbuilding project services was consistent with the lower revenue recognition of the project. In addition, the company was able to effectively control ship repair costs, including materials, labor, and related expenses, in line with the planned budget. As a result, the company’s gross profit margin increased compared to the previous year.
Cash Flow Analysis
As of 31 December 2025, cash and cash equivalents amounted to 98.92 million baht, an increase of 30.62 million baht from 2024. The details are as follows:
Net cash provided by operating activities amounted to 212.40 million baht.
Net cash used in investing activities amounted to (66.23) million baht.
Net cash used in financing activities amounted to (115.77) million baht.
Unrealized gain on exchange rate amounted to 0.21 million baht.
As a result, net cash increased by 30.40 million baht.
Cash flow from operating activities in 2025 amounted to 212.40 million baht, increasing by 249.43 million baht from 2024. The increase was mainly due to a reduction in unbilled revenue, as the company was able to issue invoices and collect payments more effectively, resulting in higher cash inflows. In addition, advance receipts from customers increased, allowing the company to receive cash before revenue recognition, which helped improve operating cash flow. Advance payments for goods also decreased, reflecting improved working capital management, as less cash was tied up in advance payments compared to 2024.
Cash flow used in investing activities amounted to 66.23 million baht, increasing by 19.41 million baht from 2024. In 2025, the company did not make any significant acquisitions of fixed assets. The main investing activity was the placement of cash deposits in fixed deposit accounts totaling 18.83 million baht.
Cash flow used in financing activities amounted to 115.77 million baht, increasing from 2024. This was mainly due to repayments of trust receipt payables totaling 65.36 million baht, repayments of long-term borrowings from financial institutions totaling 17.76 million baht, and dividend payments of 30.99 million baht from the 2024 operating results.
Sources of Funds
In 2025, the company’s total liabilities amounted to 409.22 million baht, a decrease of 92.85 million baht from the previous year. This comprised current liabilities of 347.86 million baht and non-current liabilities of 62.06 million baht.
The decrease in current liabilities was mainly due to a reduction in trust receipt payables of 65.36 million baht and a decrease in trade payables of 124.94 million baht. This was primarily attributable to the Hydrographic Survey Vessel Construction Project for the Royal Thai Navy, which had progressed to 95.80% completion in 2025 and was approaching completion. As a result, the procurement of machinery and equipment had largely been completed in accordance with the project scope. Meanwhile, the 3,000-horsepower tugboat construction project for the Sattahip Commercial Port – Royal Thai Navy was in the early stage of implementation, resulting in relatively limited procurement of machinery and equipment during the year.
Non-current liabilities decreased slightly by 0.11 million baht, mainly due to a reduction in long-term borrowings from financial institutions, as the company made early repayments of certain long-term loans.
Shareholders’ equity consisted of paid-up capital of 258.29 million baht, appropriated retained earnings of 25.83 million baht, and unappropriated retained earnings of 186.51 million baht. In 2025, the company did not allocate additional statutory reserves, as the reserve had already reached the level required by law. The increase in unappropriated retained earnings was mainly due to net profit attributable to the parent company of 43.09 million baht, partially offset by dividend payments of 30.99 million baht from the 2024 operating results.
Return on Assets (ROA)
The company’s Return on Assets (ROA) was 4.67%, decreasing from 5.67% in 2024. This indicates that the company generated a return of 4.67% from its total assets. During the year, total assets decreased by 81.87 million baht, while net profit decreased by 7.79 million baht.
The decline in assets was mainly attributable to a reduction in unbilled revenue, as the company was able to deliver work and collect payments from customers, resulting in lower outstanding balances compared to the previous year. In addition, other current receivables (prepaid expenses) decreased, mainly because the 3,000-horsepower tugboat construction project for the Sattahip Commercial Port – Royal Thai Navy was still in the early stage of implementation, leading to lower advance payments for materials and equipment.
Asset Management Capability
Asset Analysis
The Company’s total assets amounted to 882.48 million baht, a decrease of 81.88 million baht or 8.49%. Current assets declined by 78.76 million baht or 17.32%, while non-current assets decreased by 3.12 million baht or 0.61%. Key details are as follows:
Cash and cash equivalents decreased by 30.62 million baht or 44.83%. During the year, part of the cash was utilized to repay short-term borrowings and to make early repayment of long-term loans amounting to 17.76 million baht. In addition, dividend payments from the 2024 operating results totaling 30.99 million baht were made to shareholders, resulting in a reduction in cash.
Advance payments for purchase of goods decreased by 26.87 million baht or 51.30%, as most advance payments for equipment related to the Hydrographic Survey Vessel construction project for the Royal Thai Navy had already been made during 2023–2024.
Unbilled revenue decreased by 145.31 million baht or 54.70%, mainly due to the successful completion and delivery of projects, enabling the Company to issue invoices accordingly. As a result, the balance of unbilled revenue declined from the previous year.
Inventory increased by 39.58 million baht or 196.33%, primarily due to new shipbuilding projects commencing toward the end of the year. The Company procured raw materials and equipment in advance to ensure continuous project execution. Such inventories are directly related to ongoing projects and are expected to be utilized and recognized as costs in line with the project schedule.
Property, plant, and equipment decreased by 8.78 million baht or 2.30%. During the year, the Company did not invest in significant high-value assets, except for improvements to the floating dock to enhance operational efficiency and support business operations.
Liabilities Analysis
The company’s total liabilities are reported at 409.92 million baht, a decrease of 92.85 million baht or 18.47%. Key details are as follows:
Bank overdrafts and short-term loans from financial institutions decreased by 60.36 million baht or 28.65%. Short-term borrowings from financial institutions increased by 5.00 million baht, while trust receipts payable decreased by 65.36 million baht. This was mainly because the Hydrographic Survey Vessel Construction Project for the Royal Thai Navy progressed to 95.80% completion in 2025, entering the final stage of the project. As a result, there was less need to procure high-value machinery and equipment compared to 2024, leading to lower utilization of the company’s trust receipt financing from the bank.
Trade payables and other current payables decreased by 124.94 million baht or 71.61%, mainly due to payments made for materials and equipment related to the hydrographic operations vessel construction project from both domestic and overseas suppliers. The decrease was in line with the progress of the project, resulting in a significant reduction in the procurement of major items.
Advance received from customers increased by 94.59 million baht or 10,998.84%, as the company received payments under shipbuilding contracts for vessels that have not yet been delivered.
Shareholders' Equity Analysis
Shareholders’ equity amounted to 472.55 million baht, an increase of 10.97 million baht or 2.37% compared to 2024. This change was mainly due to a decrease in total comprehensive income of 9.12 million baht, while dividend payments of 30.99 million baht were made from the 2024 operating results.
Other Analysis
| Title | Description | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue Recognition Policy and Accounts Receivable Quality Analysis | Revenue recognition policy and Trade and other current Receivables analysis The company has the revenue recognition following :
Trade Receivables Quality Analysis The company provides an allowance for doubtful accounts based on an estimate of potential losses that may arise from uncollectible receivables. The allowance is determined based on the company’s past collection experience and the current status of outstanding receivables as of the date of the statement of financial position. Aging Analysis of Trade Receivables As of 31 December 2025, trade receivables can be analyzed according to the aging of outstanding balances as follows:
The movements of allowance for doubtful accounts were as follows:
As of 31 December 2025 and 2024, the Company and its subsidiaries had long-outstanding trade receivables and other current receivables totaling approximately Baht 22.0 million and Baht 19.1 million, respectively. The Company and its subsidiaries have already recognized expected credit loss allowances totaling approximately Baht 26.0 million and Baht 20.5 million, respectively (Baht 22.0 million and Baht 20.5 million, respectively, for the Company only). The Company is currently in the process of closely monitoring and following up on the collection of these receivables. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Leasehold rights over land and buildings | The right to lease land and buildings 20 January 1988 A subsidiary company has entered into a sublease agreement of state property with a port and warehouse from a sublessor. The contract has a term of 24 years and the lease term has ended in January 2012. The Company has continued to negotiate the lease of the said assets from the original contract on behalf of the subsidiary. In 2013, the Company received the right to lease directly from the Treasury Department. from the original contract with details and conditions as specified in the new lease dated 26 April 2013. 26 April 2013 The Company has entered into a lease agreement for land and buildings with the Treasury Department. with a lease term of 30 years starting from 22 April 2012 ending 21 April 2042 The company has to pay for the right to lease the land with such buildings on the contract date and other expenses. related to money 32,036,250 baht and must pay the rent annually for the duration of the lease The details of the annual rental rate as stipulated in the contract are as follows: 1 - 5 at an annual rate 1,467,139 baht 6 - 10 at an annual rate 1,687,210 baht 11 - 15 at an annual rate 1,940,290 baht 16 - 20 at an annual rate 2,231,335 baht 21 - 25 at an annual rate 2,566,035 baht 26 - 30 at an annual rate 2,950,940 baht Total rent for the duration of the contract 64,214,745 baht Right-of-use assets include leasehold right of land and buildings and vehicle. The leasehold right of land and buildings is leasing the area with the Treasury Department. Such agreement period is 30 years from the years 2012 to 2042. On August 23, 2018, Treasury Department Samut Prakarn has issued a letter requesting the Company to pay the rent, rental arrangement fees and additional damages in case of building construction and structures without permission, damages from demolition of buildings and structures under the original lease agreement and in case seeking benefits from royal property without permission at the total amount of Baht 222.17 million. Later on September 12, 2018, the Company has issued a letter of objection to the collection of rent, rental arrangement fees and damages in such amount. The significant reason is the land and buildings lease agreement that is legitimate from the Ministry of Finance. It is carried out according to the resolution of the state property No. 1/2012 as well as informing the rental rate, rental arrangement fees and other conditions. The Company has considered and agreed to enter into the lease agreement and always pays the rent and follows the agreement correctly. Therefore, this claim is not in the terms of the agreement. In addition, the various claims for damages are a matter between Ministry of Finance and the lease parties during that time (The Agricultural Co-operative Federation of Thailand). Later, on March 31, 2021 and August 4, 2021, the Company received the letter from the Treasury Department Samut Prakarn for the Company to still pay rent, rental arrangement fee and such additional damages by considering to collect Baht 206.46 million (from Baht 222.17 million). However, on April 26, 2021 and August 26, 2021, the Company made an objection letter for the collection of rent and rental arrangement fees and such additional damages and confirmed the compliance under the lease agreement correctly and completely in accordance with the principles or instruction of the Treasury Department as described above Later, on March 9, 2023 the Company received a letter from Treasury Department Samut Prakarn for the company to pay the rent, rental arrangement fees and damages in case of building demolition and construction without permission, including interest at 5 percent per annum in total Baht 228.75 million (from previous Baht 206.46 million) within 7 days from the receiving date of the letter. If the above period has passed, the Treasury Department would exercise the right to terminate the lease agreement including confiscate all the pledged security of the lease agreement and will take further legal action. Later, on March 23, 2023, the Treasury Department Samut Prakarn issued a letter to terminate the lease agreement and confiscated the lease security Baht 1.94 million from the breach of terms from not settling payment within the specified time. Also, it requested the Company to leave the leased premise, deliver the leased property, components and equipment of the leased premise used in operating the business to the Ministry of Finance in a ready state within 30 days from the lease termination date. On March 29, 2023 the Company made a letter of complaint to seek justice to the Director General of the Treasury Department on the procedures taken by the Treasury Department Samut Prakarn that did not align with the agreement provisions and law. The Company did not receive justice and it still confirmed always having complied with the agreement and paying rentals completely in accordance with the agreement requirements. On February 5, 2024, the Company transferred the land rental payment for the year 2024 in the amount of Baht 1.94 million to the Treasury Department Samut Prakarn. Later, on February 27, 2024, the said office notified the Company of a refund of the rent. The Company received the refund on March 18, 2024. Therefore, on April 3, 2024, the Company placed the said rental money at Samut Prakarn Provincial Legal Execution Office to comply with the state Property Land Lease Agreement with the Treasury Department. The Company has already notified the Treasury Department Samut Prakarn on April 9, 2024. Later, on April 11, 2024 and June 11, 2024 the Company drafted a letter to request a review of the illegal agreement termination. On November 19, 2024 the Company made a letter to the Ministry of Finance regarding the complaint against injustice practice of the Treasury Department, a department under the Ministry of Finance, for the Ministry of Finance to consider having the Treasury Department to review and terminate the illegal land lease agreement. On February 6, 2025 the Company made a letter to acknowledge the result of consideration on such matter from the Ministry of Finance. Presently, the Company has not acknowledged the result of such explanation. On February 7, 2025, the Company had placed the land rental payment for the year 2025 in the amount of Baht 1.9 4 million at the Samut Prakarn Provincial Legal Execution Office to comply with the state property land lease agreement with the Treasury Department. On February 11, 2025, the Company had sent a letter to inform the Treasury Department Samut Prakarn. On July 30, 2025, the Company authorized its lawyers to write a letter to the Director-General of the Treasury Department and the Minister of Finance, requesting compliance with the Crown Property Lease Agreement and cancelling the confiscation of the Crown Property Lease Security. The letter stated its intention to refuse to pay the rent, rental arrangement fees, and damages totaling Baht 228.75 million, as these are requests for rent, rental arrangement fees, and damages beyond those specified in the Crown Property Lease Agreement and reject the termination of the lease agreement of the Crown Property and the confiscation of the security under the lease agreement. It requested the Treasury Department and the Ministry of Finance to order the cancellation of the termination of the lease agreement of the Crown Property and the confiscation of the security under the lease agreement because it is a termination of the lease agreement of the Crown Property and the confiscation of the security under the lease agreement of the Crown Property which is not in accordance with the lease agreement and the law. It requested for payment of damages from not allowing the installation of the solar power generation system in the amount of Baht 3.45 million with interest at the rate of 5 percent per annum, to be paid within 15 days after receiving the letter. If being ignored, the company will proceed with legal action. On October 22, 2025, the Company filed a lawsuit against the Treasury Department and the Ministry of Finance to the Civil Court. The Court scheduled a hearing on December 22, 2025. Later, it rescheduled to February2, 2026 for the Court to render a judgment canceling the contract and forfeit the security by allowing the Company to install a solar power generation system and demanding damages in the amount of Baht 3.75 million, including interest at 5 percent per annum from the date of the lawsuit until payment is complete. The court has forwarded the case file to the mediation center, scheduling a mediation session for February 2026 and witness testimony from both the plaintiff and the defendant on July 23-24, 2026. As at December 31, 2025, the Company has not recorded the rent, rental arrangement fee and damages following such requirements of the Treasury Department in the financial statements as such matters may require further legal proceeding so there may be uncertainties regarding the payment. Therefore, the Company has not set aside the reserve for the damages of assets and the allowance for contingent liabilities in the financial statements as at December 31, 2025. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Investment in Marketable Securities | at 31 december 2025 The company has no investments in available-for-sale securities. because the company has no policy to invest money Most of the money will be used as working capital for operations. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Foreign Exchange Risk Management | The company's shipbuilding projects need to import raw materials from abroad, such as Ship Plate, machinery and equipment used in ships The import of such raw materials may be affected by fluctuations in exchange rates, resulting in higher production costs. Therefore, the company has a policy to manage foreign exchange risks that may occur. by purchasing the full amount of foreign currency in advance However Factors that companies use in considering foreign currency purchases to manage their exchange rate risk are: • There is a large quantity of raw material orders from abroad. • It takes a long time to process the order or deliver the product. • The volatility of the money market and the trend of the baht • Risk prevention cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Debt Securities with Financial Ratio Requirements
Debt Securities with Financial Ratio Requirements Issued?
No
Factors That May Affect Financial Condition
Factors or Incidents That May Materially Affect Financial Condition
The Thai economy in 2025 expanded higher than expected at 2.4%, particularly in Q4/2025, which grew by as much as 2.5% year-on-year. When examining each component of GDP, this high growth rate was primarily driven by: 1) accelerated private consumption, 2) private investment expanding at its highest rate in 13 quarters, led by a recovery in private investment in vehicles, machinery, and construction, and 3) a resurgence in government spending due to accelerated budget disbursement and economic stimulus measures.
Furthermore, while merchandise exports continue to expand at a high level, they have begun to slow down somewhat, following a decline in agricultural products and certain industrial categories amidst intense global price competition. Meanwhile, service exports continue to contract, reflecting the tourism sector's incomplete recovery. Consequently, the overall economy has improved, primarily driven by domestic demand, supported by financial injections and temporary stimulus measures.
As for the ship repair market in 2026, it is projected to be "stable to increasingly competitive." Although cyclical work remains, a potential weakening in the maritime transport cycle at certain times may lead shipowners to control costs more strictly. Domestic maritime transport analysis indicates that freight rates and transport revenues may face pressure in 2026, often causing shipowners to postpone non-urgent repairs and negotiate prices more aggressively. However, the impetus from IMO's carbon regulations will continue, making energy efficiency upgrades and compliance-related work difficult to defer. Consequently, the repair market in 2026 is likely to be divided into two types: mandatory/statutory repairs, which are stable, and preventive or additional upgrade repairs, which may face price pressure and deferrals.
Thailand's ship repair market for vessels sized 500–20,000 DWT in 2025 represents a stable demand base due to a large fleet of small vessels and environmental regulatory pressures driving energy efficiency-focused repairs. In 2026, there is a trend towards increased competition in terms of price and efficiency, influenced by the shipping cycle. However, continuous support from IMO regulations and safety requirements remains. This segment of the ship repair market is transitioning from competition based on "price and shipyard availability" to competition based on "quality, speed, and ability to meet environmental standards," which will be a decisive factor for the competitiveness of Thai shipyards in the next phase.
As for the new shipbuilding market in 2026, Demand Outlook: "Commercial caution rises, but specialized vessels continue." The overall maritime shipping industry is projected to see weakening revenues during 2026–2027 due to declining freight rates and a potential contraction in maritime import-export volumes in 2026. This has an indirect impact on "new shipbuilding." Conversely, shipbuilding work in Thailand, which focuses on specialized vessels/support vessels/tourism vessels/mission vessels, will exhibit greater "flexibility."
For Thailand, the shipbuilding industry primarily focuses on ship repair, with limitations in size and technology compared to market-leading countries. Nevertheless, the trend of ship upgrades (and the transition to a low-carbon economy) presents a significant opportunity to enhance the capabilities of the Thai industry over the next 3–5 years.
Adapting to ESG guidelines for business sustainability. The International Maritime Organization (IMO) has introduced measures to reduce greenhouse gas emissions from international shipping, encouraging all vessels to use fuel with less than 0.5% sulfur content, down from the previous 3.5%. It also sets a target to reduce shipping emissions by at least 70% by 2050 and may implement carbon taxes on cargo ships. These measures are expected to be certified by 2025 (the shipping industry accounts for 2-3% of global carbon emissions). This necessitates the shipbuilding and ship repair industries to adapt in several areas, such as modifying equipment or adding waste removal tools, and designing new environmentally friendly ship models.